Offer ends in

Days
Hours
Minutes

The offer starts at:

Days
Hours
Minutes
Seconds

From November 28th through December 12th

Offer ends in:

Days
Hours
Minutes
Seconds

LEAD TIMES FOR INSTALLATION AS QUICK AS 4-8 WEEKS FOR UTAH ORDERS!

Color & Sheen

Prior to the project start, we will talk about color and sheen selection. We will guide you on proper sheen choice per area you wish to paint, if you would like to match the surface, we can use the same formula used on a previous can of paint that you have, or cut a quarter size sample from the desired surface to match and take it to our paint provider to do the closest match possible.n.

Protection

This is the first step we will work on when arriving at your house and it includes covering flooring with builders paper or drop cloths of the rooms involved, and covering any furniture, light fixtures or fans with painters plastic..

Preparation

After everything is protected, we start filling holes, cracks, and gaps in the walls using spackling compound, sealing lines and gaps on trim work with caulking and putty, and applying primer to any surface that needs it. i.e drywall repairs or patches, stains, and bare wood.

Scroll to Top